Automatic label removal and replacement station
Start with an offline single-station label-repair prototype linking localization, removal, replacement, reinspection and code mapping. Adhesive and release-liner variations need testing. Capacity and yield figures are targets.
Request configuration adviceFor plans and project enquiries, contact:
610015486@163.com · 18611193215 ·
Application / concept illustrationEmbodied Intelligence site editor · Content reviewed
Conditions to establish first
- Label dimensions, adhesive and release liner
- Edge lifting, peeling and waste-label collection
- Post-application checks and old/new code updates
- Nature of the source material
- Internal proposal; no delivered-project acceptance evidence supplied
- Configuration and pricing
- The source provides no verifiable current quotation. Confirm pricing against the site's task, configuration and validation scope.
- Conditions and limits of use
- Capacity, yield, accuracy and labor-saving figures are suggested product-design targets. They depend on validation of label dimensions, adhesive, release liner and process.
- Evidence still needed
- Capacity, yield, accuracy and labor-saving figures are design suggestions, not existing operating results.
Sources and how to use them
10自动揭标补标工作台产品解决方案建议书V0.8.docx
This is a summary of the original proposal, not a claim that the site editor has manufactured, sold or delivered the equipment. Check configuration, engineering targets and measured results separately.
From a concept to field validation ↗Core capabilities and configuration
Constant-tension roll-to-roll transport and secondary vision alignment
Dedicated edge lifting, vacuum gripping and constant-force peeling actuators
Negative-pressure waste-label collection and cleanliness control
New-label feed, XYθ pose correction, replacement and pressing
Check position, angle, code data and security features after application
Write before/after images and old/new code mappings to MES/QMS
Applications
Task workflow
From concept to site
Start with an offline single-station rework prototype. Validate standard self-adhesive labels before extending to security features, multiple SKUs and dual stations.
Related products and systems
Take your field requirements
into the next stage of planning.
Share the workpiece, site layout and target cycle time to discuss product selection, system configuration and validation.


