Cross-floor AMR delivery
This cross-floor AMR proposal uses manual loading/unloading and robotic transport in phase one. Door/lift interfaces, interlocks and passage with the rack fitted require site confirmation and joint tests.
Request configuration adviceFor plans and project enquiries, contact:
610015486@163.com · 18611193215 ·
Application / concept illustrationEmbodied Intelligence site editor · Content reviewed
Conditions to establish first
- Actual load and center of gravity
- Clearance envelope with the rack fitted
- Door/lift signals and safety interlocks
- Nature of the source material
- Project proposal
- Configuration and pricing
- The source provides no verifiable current quotation. Confirm pricing against the site's task, configuration and validation scope.
- Conditions and limits of use
- Phase one uses manual loading/unloading and robotic transport. Lift interfaces, doorway width, thresholds, turning space and supporting modifications require site confirmation.
- Evidence still needed
- Base-platform reference values do not establish system passage, load or cycle time after a rack is fitted.
Interpreting numbers in the material
The project material uses a typical load of 50–60 kg per trip. Validate this with the rack, center of gravity and route.
The material sets a peak-load requirement of no more than 100 kg. This is a project boundary, not a measured load rating.
The recommended base has a reference rated payload of 150 kg. This is not a system commitment with a rack fitted.
Sources and how to use them
04餐箱及零配件跨楼层自动配送AMR方案汇报V0.8.pptx
This is a summary of the original proposal, not a claim that the site editor has manufactured, sold or delivered the equipment. Check configuration, engineering targets and measured results separately.
From a concept to field validation ↗Problems addressed
- Frequent manual cart transport
- Varied materials with cleanliness requirements
- Cross-floor transport depends on coordinated lifts and doors
Core capabilities and configuration
Dual-zone rack for delivery and returns
Lift calls, floor selection and status feedback
Door controls and robot safety interlocks
Arrival alerts and low-battery return to charge
Applications
Task workflow
From concept to site
Phase one uses manual loading/unloading and robotic transport. Lift interfaces, doorway width, thresholds, turning space and supporting modifications require site confirmation.
Related products and systems
Take your field requirements
into the next stage of planning.
Share the workpiece, site layout and target cycle time to discuss product selection, system configuration and validation.

